top of page
serious inquiries only contact us page
Welcome | ברוך הבא | Welkom | Willkommen | Bienvenido | أهلا بك | Dobrodošli | Bienvenue | 歡迎 | ようこそ | Välkommen | Shalom
BUILDING YOUR ISLAND DREAM CUSTOM HOME BUILDERS
BUILD IN HALF THE TIME WITH OUR PATENTED
ECO GREEN - PREFAB SYSTEM
ORDER | INSTALLATION - EASY AS IT CAN GET
1,2,3 STEPS
SIMPLE 1, 2, 3 STEPS:
A.../ YOUR HOME DESIGN AND ENGINEERING NEEDS TO BE COMPLETED BY OUR TEAM OF EXPERTS.
*EVEN IF YOU HAVE YOUR OWN DESIGNED PLANS WE STILL NEED TO REDESIGN AND ENGINEER AND PLAN YOUR ENTIRE PROJECT COST EFFECTIVELY AND MOST IMPORTANTLY CORRECTLY LAYOUT AND PLAN YOUR ENTIRE HOUSE PLANS TO MEET OUR COMPANIES 200 MPH+ HURRICANE ENGINEERED STANDARDS.
B.../ BUILDING PERMIT REQUIRES LOCAL PLANNING PERMISSION TO START ANY CONSTRUCTION PROJECT. YOUR APPLICATION WILL BE SUBMITTED THROUGH US NOW FOR APPROVALS.
C.../ ALL HOUSE BUILDING MATERIALS ARE THEN FACTORY ORDERED AND BUILT TO ORDER.
D.../ ONCE YOUR LOCAL BUILDING PERMIT HAS BEEN ISSUED - LAND CLEARING AND SITE EXCAVATING CAN BEGIN.
E.../ INFRASTRUCTURE AND CONCRETE FOUNDATION ARE NOW PREPARED ON YOUR LAND.
WHILE AT THE SAME TIME YOUR ENTIRE PREFAB HOME IS BEING CONSTRUCTED AT OUR FACTORIES SUPPLIERS.
F.../ KITCHEN, BATHS, WINDOWS AND DOORS, INTERIOR DOORS AND ALL ORDERED SELECTED FINISHES
ARE ALSO ALL ORDERED AT THIS TIME. *6 TO 8 WEEKS ORDER TIME READY TO LOAD.
G.../ AS YOUR FOUNDATIONS ARE BEING FINISHED WE ARE ARRANGING ALL SHIPPING AND PREPARING ALL YOUR BUILDING PRODUCTS READY TO LOAD INTO CONTAINERS AT FACTORY.
H.../ AS COMPLETION OF THE POURING OF YOUR CONCRETE FOUNDATIONS IS COMPLETED THEY ARE LEFT TO SET UP FOR THE REQUIRED STRUCTURAL CURING TIME OF 35 DAYS.
DURING THAT SAME TIME YOUR CONTAINERS ARE SHIPPED AND DELIVERED TO THE JOB-SITE WHERE UNLOADING AND YOUR PREFAB INSTALLATION BEGINS.
Whatever your design style is:
we custom design | ship to | deliver and build your dream home on any island around the world.
bottom of page